On the N34, at the level of Hardenberg, lies the most sustainable car pool location of Overijssel province. Thanks to the CirculinQ CCL elements used to realise the parking spaces, travellers can park here on circular and sustainable paving.
Suitable for parking, cycling and walking
The Dutch infrastructure systems are busy, both above and below ground. Above ground, we want to be able to move from A to B as quickly and safely as possible, while below ground, invisible networks of cables and pipelines provide for clean drinking water, energy for our homes and so on. It seems self-evident, but the space is limited and heat stress, heavy rainfall and drought form a growing threat to living conditions. CirculinQ supplies element paving as an integral solution for above-ground and underground challenges, suitable for light forms of traffic.

Parking spaces

Cycle paths
The first official CirculinQ project was the laying of a cycle path in Zwolle in 2018. In the following years, CirculinQ solutions have proved their value in projects for cyclists in cities including Gouda, Delft and Antwerp.

Footpaths
The first projects for CirculinQ footpaths have already been realised, including a footpath at the De Efteling theme park, a combined footpath and cycle path in Ritthem and a safe Viewing Path for ProRail.